
Finally, the pier is ready! The welder did a fantastic job.
It’s 8 inch diameter schedule 40 pipe that’s 52 inches tall. It will get painted then installed inside the dome. Can’t wait!
This entry was posted
on Friday, June 25th, 2010 at 14:56 and is filed under Looking up.
You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.